About 8,400 meters of roads, and 35,000 meters of interlocking were completed and drainage works were carried out on the Airport Road. The roads that have been revived include Al-Sayed Youssef Road, and the Western Rams Road from the Airport Bridge to Al-Matahn Bridge. The airport, Rams, and Karnak Temple roads and King Abdullah Square were decorated with plants as a special addition. Two other squares were created on the Airport Road, lighting, plants and modern irrigation methods were also installed. The development works included paving the floors using marble, granite and black basalt and making planting basins containing various forms of plants.