KeNHA to open Witeithie footbridge to the public : The Standard - News Summed Up

KeNHA to open Witeithie footbridge to the public : The Standard


KeNHA to open Witeithie footbridge to the publicThe traffic management plan released by KeNHA yesterday. Thereafter, speed bumps at Witeithie will be removed for a smooth flow of traffic at the stretch notorious with traffic jams. It blamed Interways Construction Works for poor traffic management and directed it only block the highway and divert traffic between 11 pm to 4 am. Traffic Updates at Witeithie (Along Nairobi - Thika Superhighway) pic.twitter.com/9hj8HypXgT — Kenya National Highways Authority (KeNHA) (@KeNHAKenya) December 24, 2019“At Witeithie, the contractor notified KeNHA that they experienced a hiccup when hoisting part of the steel superstructure for the pedestrian footbridge last night. This greatly affected traffic flow for the Thika-bound traffic, causing a massive traffic jam,” KeNHA posted on Twitter.The Witeithie footbridge is part of a Sh822 million project to ease the pedestrian crossing at Garden Estate Junction, Survey of Kenya, Witeithie, and Mang’u.


Source: Standard Digital December 30, 2019 12:33 UTC



Loading...
Loading...
  

Loading...

                           
/* -------------------------- overlay advertisemnt -------------------------- */