Liberia: Water & Sewer Management Blames Woeful Sewage System to Over-Population, Low Budgetary Support - News Summed Up

Liberia: Water & Sewer Management Blames Woeful Sewage System to Over-Population, Low Budgetary Support


Capitol Hill, Monrovia – The Managing Director of the Liberia Water & Sewer Corporation (LWSC), Duannah Kamara has blamed the country’s failed sewage system to the huge population size of Monrovia and limited budgetary support to the entity. Addressing Plenary on Thursday, Duannah said the sewage problem was and aged-old situation inherited by his team, but they were doing all within their reach to tackle it. He said the sewage line was built in 1966 to serve about 200,000 people but now the number of people accessing the sewage system has quadrupled. Along the line, there are several pumping stations -at the Barclay Training Center (BTC), Capitol By-pass and Sinkor. But all these stations are blocked and not functioning well because residents have built structures along these lines.


Source: Front Page Africa April 28, 2021 07:38 UTC



Loading...
Loading...
  

Loading...

                           
/* -------------------------- overlay advertisemnt -------------------------- */