No official inauguration as the model code is in forceThe four-lane Palarivattom flyover, which was rebuilt by Delhi Metro Rail Corporation (DMRC) in a record time of five months and 10 days, was opened for traffic on Sunday evening. TensionSoon after the flyover was opened, there was tension when LDF and BJP activists converged near the structure, bearing flags. Earlier, Chief Minister Pinarayi Vijayan had credited workers who braved rain and shine to complete the reconstruction ahead of schedule in his Facebook page. The State government decided to rebuild the flyover, as it would ensure 100-year life span for the structure. Meanwhile, a probe by the Vigilance and Anti Corruption Bureau (VACB) is under way into irregularities in the construction of the original structure which cost ₹47.70 crore.
Source: The Hindu March 07, 2021 18:53 UTC