MONROVIA – The construction of the raw water pipeline for the Liberia Water and Sewer Corporation (LWSC) is more than 50 percent complete and on schedule to be completed in September 2020. The US$18 million pipeline will draw water from the dam of the Mt. The current location of LWSC’s intake pipe results in poor water quality and salty water during the dry season when the St. Paul River level is low, as water from the Atlantic Ocean washes back into the river. Instead of retrieving water from downstream and closer to the ocean, the pipeline will draw water from the reservoir upstream. Funded by the Millennium Challenge Corporation for the Government of Liberia, the raw water pipeline is part of the Energy project under the compact, which is committed to reducing poverty in Liberia by promoting economic growth and inclusion.
Source: Front Page Africa March 07, 2020 10:07 UTC